Case Study · Corporate Office · Midtown Manhattan

From street to wall

How a long in-wall aquarium went up by crane, through a window and into the architecture.

From street to wall
System
Long in-wall aquarium set into wood paneling
Setting
Corporate office, West 34th Street, Manhattan
The challenge
Delivered by crane through an upper-floor window
Timeline
May – June 2017

Designed into the wall

The aquarium was planned as part of the architecture: a single, long band of water set flush into floor-to-ceiling grey wood paneling, with every piece of equipment hidden in the millwork below.

The tank was too large to come up through the building, so it arrived the only other way: by crane, from the street, through a window.

01 · The niche

May 2017

Before the tank arrived, the paneled wall was finished with its opening and steel support frame waiting. The aquarium was built into the design, not added after.

From street to wall — May 2017From street to wall — May 2017From street to wall — May 2017

02 · Dawn on 34th Street

May 16, 2017

The lift was scheduled for first light, before Midtown traffic. The crane truck set up at the curb while the street was still quiet.

From street to wall — May 16, 2017From street to wall — May 16, 2017From street to wall — May 16, 2017

03 · The lift

May 16, 2017

Crated and rigged, the tank went straight up the face of the building to the office floor.

From street to wall — May 16, 2017From street to wall — May 16, 2017

04 · Through the window

May 16, 2017

The crate was guided in through the window opening by our crew, then the glass was moved across the office on dollies to its niche.

From street to wall — May 16, 2017From street to wall — May 16, 2017From street to wall — May 16, 2017

05 · Driftwood and sand

June 2017

The aquascape was built from sculptural driftwood over a bright white sand bed, chosen to read as a single landscape across the long, low tank.

From street to wall — June 2017From street to wall — June 2017

06 · Bringing it to life

June 2017

With the tank set, the layout was built and the lighting tuned inside the finished wall.

From street to wall — June 2017From street to wall — June 2017

07 · Finished

June 2017

A single illuminated band of water runs across the paneled wall, with nothing mechanical in sight.

From street to wall — June 2017From street to wall — June 2017From street to wall — June 2017From street to wall — June 2017From street to wall — June 2017From street to wall — June 2017

The film